<!-- https://farmer1st.org/en/glossary/date-of-production/ · updated 2026-11-19 -->
# Date or time range of production (EUDR)

> Under Article 9(1)(d) of the EUDR, operators record, together with the geolocation of all plots of land, the date or time range of production of the relevant commodities, meaning when they were grown, harvested, obtained from or raised on those plots.

Also known as: time of production, production date, harvest date, production period

## Why does it matter?

The [EUDR](/glossary/eudr/) asks for the geolocation of plots *and* when the commodities were produced there (Article 9(1)(d)). The date links a harvest to the state of its [plot of land](/glossary/plot-of-land/) at that time, so that deforestation after the [cut-off date](/glossary/cut-off-date/) of 31 December 2020 can be related to the commodities produced. It also determines whether a product falls within the Regulation's scope in time (Article 1(2)).

## How does it work in practice?

- **What "produced" means.** Grown, harvested, obtained from or raised on relevant plots of land or, for cattle, on establishments (Article 2(14)).
- **Date or range.** A single date or a time range, such as a harvest season, is accepted.
- **Per plot.** The date or range goes with the [geolocation](/glossary/geolocation/) of the plots, as part of the [information requirements](/glossary/information-requirements/) kept for five years.
- **At the first mile.** The most reliable source is the record made when the farmer delivers: which plot, which crop, which date. That is where [first-mile traceability](/glossary/first-mile-traceability/) starts.

## Common pitfalls

- **Using the shipment or invoice date.** The requirement is about production, not trade.
- **One range for a whole region.** A range should still be tied to the plots that supplied the lot.
- **No link between delivery and plot.** Without it, the production date cannot be shown for the plots declared.

Farmer1st records deliveries with plot and date at the first mile through its [traceability and certification](/services/traceability-certification/) service. See the [EUDR guide](/guides/eudr/) for the full information requirements.


## Frequently asked questions

### Is a date range acceptable, or does it have to be a single date?

Article 9(1)(d) accepts either a date or a time range of production.

### Why does the production date matter for scope?

Except as provided in Article 37(3), the Regulation does not apply to relevant products produced before the date indicated in Article 38(1) (Article 1(2)). The production date shows which side of that line a product falls.


## Sources

- [Regulation (EU) 2023/1115 (EUDR), consolidated text, EUR-Lex](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:02023R1115-20251226)
